Dry Shakes & Industrial Flooring Aggregates
Easy solutions for tough jobs...
Dry Shake Application
Stage 1
Roof in situ, suitably prepared ground ready to receive concrete sub floor.
Stage 2
Place base concrete to provide a suitable structural slab, in accordance with standard flooring practice.
Stage 3
Achieve rapid placement and finishing of the concrete base with laser screed equipment, ideal for fast track projects.
Stage 4
Remove surface bleed by manual methods as necessary.
Stage 5

Apply dry shake by means of an automatic spreader to achieve complete control over application rate.
Stage 6

Finish by either hand or powered trowel.
Dry Shake Colour Range
Light Grey
Medium Grey
Dark Grey
Green
Red
Natural
Available in 5 standard colours plus natural with other colours available on request